Follow
Afrizal Nursin
Afrizal Nursin
Politeknik Negeri Jakarta
Verified email at sipil.pnj.ac.id
Title
Cited by
Cited by
Year
Critical success factors in developing collaborative design-build project team to improve project performance
A Nursin, Y Latief
MATEC Web of Conferences 159, 01025, 2018
162018
Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Dinding Proyek Tamansari Iswara Apartment
AP Cahyani, A Nursin
Prosiding Seminar Nasional Teknik Sipil 1 (1), 567-574, 2019
72019
Analisis Produktivitas Tenaga Kerja Pekerjaan Dinding Proyek Gedung PPA Kejagung RI
KG Alicia, A Nursin
Prosiding Seminar Nasional Teknik Sipil, 166-173, 2020
62020
Development of Work Breakdown Structure for Stadium Work as Project Guideline and Standard
A Putro, Y Latief, A Nursin, BS Soepandji
International Journal of Engineering 35 (7), 1291-1299, 2022
52022
Evaluasi non-physical waste dengan lean construction pada proyek gedung sanggala
MG Tamallo, A Nursin
Prokons: Jurnal Teknik Sipil 14 (2), 12-18, 2020
52020
Analisis Produktivitas Tenaga Kerja Pekerjaan Dinding Bata Ringan
JBJK Andris, A Nursin
Prosiding Seminar Nasional Teknik Sipil, 18-23, 2020
52020
Alat Berat untuk Konstruksi
A Nursin
Depok: Politeknik Negeri Jakarta, 2008
52008
Penerapan Green Construction Pada Proyek Pembangunan TOD Mahata Margonda
MU Masloman, A Nursin
Construction and Material Journal 3 (1), 41-49, 2021
42021
CROSS-PARTY COLLABORATION TO REDUCE CONSTRUCTION WASTE TO DESIGN-BUILD PROJECTS
HGS Afrizal Nursin, Yusuf Latif, Krishna Mochtar
International Journal of Technology 4 (Construction Management), 751-765, 2018
4*2018
Optimasi Penempatan Tower Crane Terhadap Waktu Siklus Pada Proyek X
H Muliawan, A Nursin
RekaRacana J. Tek. Sipil 8 (01), 22-31, 2022
32022
Alat Berat untuk Proyek Konstruksi
A Nursin, F Susilowati, N Martina
PNJ PRESS, 2020
32020
Pertumbuhan barang sisa konstruksi (Construction waste) di Indonesia
A NURSIN, Y LATIEF, I ABIDIN
Jurnal Poli-Teknologi 13 (1), 2014
32014
Analisis Produktivitas Alat Pancang Hydraulic Static Pile Driver Untuk Meningkatkan Kinerja Waktu Pada Proyek Apartemen Apple 3 Condovilla
M Puspitasari, A Nursin
Construction AND Material Journal 3 (3), 207-217, 2021
22021
Analisis Pengaruh Kerja Lembur terhadap Produktivitas Tenaga Kerja Konstruksi pada Pekerjaan Struktur Bawah
W Kurniawan, A Nursin
RekaRacana: Jurnal Teknil Sipil 7 (2), 120, 2021
22021
Strategy for increasing tender success in Jakarta’s e-tender construction project
D Budianto, AD Rarasati, A Nursin
IOP Conference Series: Materials Science and Engineering 1098 (2), 022052, 2021
22021
Last Planner System (LPS) Implementation on Jakarta-Cikampek II Elevated Toll Road Project
A Nursin
Applied Research on Civil Engineering and Environment 2 (01), 17-22, 2020
22020
Last Planner System pada Proyek Rumah Susun Transit Oriented Development
A Nursin, F Fitria, TW Sari
Prosiding Seminar Nasional Teknik Sipil, 32-40, 2020
22020
Analisis Waktu Siklus Tower Crane Pada Proyek South Side Apartment
H Fadhila, A Nursin
Prosiding Seminar Nasional Teknik Sipil 1 (1), 659-666, 2019
22019
CONSTRUCTION MANAGEMENT SCORECARD MEASUREMENT MODEL FOR ASSESSMENT OF PERFORMANCE CONSTRUCTION MANAGEMENT PROJECT
A Nursin, S Wacono, I Pratomojati
Jurnal Poli-Teknologi 10 (1), 2011
22011
The Effect of Project Communications Management on Project Time Performance
NA Manuputty, A Nursin
Applied Research on Civil Engineering and Environment (ARCEE) 4 (01), 9-21, 2023
12023
The system can't perform the operation now. Try again later.
Articles 1–20