Follow
Chang-Yong, Yi
Title
Cited by
Cited by
Year
Integrated simulation system for construction operation and project scheduling
DE Lee, CY Yi, TK Lim, D Arditi
Journal of computing in civil engineering 24 (6), 557-569, 2010
672010
An advanced stochastic time‐cost tradeoff analysis based on a CPM‐guided genetic algorithm
HG Lee, CY Yi, DE Lee, D Arditi
Computer‐Aided Civil and Infrastructure Engineering 30 (10), 824-842, 2015
652015
Concurrent construction scheduling simulation algorithm
TK Lim, CY Yi, DE Lee, D Arditi
Computer‐Aided Civil and Infrastructure Engineering 29 (6), 449-463, 2014
442014
Stochastic carbon emission estimation method for construction operation
CY Yi, HS Gwak, DE Lee
Journal of Civil Engineering and Management 23 (1), 137-149, 2017
192017
Stochastic optimal haul-route searching method based on genetic algorithm and simulation
HS Gwak, CY Yi, DE Lee
Journal of Computing in Civil Engineering 30 (3), 04015029, 2016
112016
Image processing and QR code application method for construction safety management
JS Kim, CY Yi, YJ Park
Applied Sciences 11 (10), 4400, 2021
92021
Resource-based quality performance estimation method for construction operations
YJ Park, CY Yi
Applied Sciences 11 (9), 4122, 2021
82021
Stochastic multi-variate performance trade-off method for technical tender evaluation
CY Yi, HS Gwak, BS Kim, DE Lee
KSCE Journal of Civil Engineering 22, 4240-4253, 2018
72018
Construction equipment fleet optimization for energy saving in earthmoving operation
CY Yi, HC Lee, JW Seo, DE Lee
Journal of the Architectural Institute of Korea Structure & Construction 31 …, 2015
62015
A Stacked Generalization Model to Enhance Prediction of Earthquake-Induced Soil Liquefaction
S Preethaa, Y Natarajan, AP Rathinakumar, DE Lee, Y Choi, YJ Park, ...
Sensors 22 (19), 7292, 2022
42022
Setting Process Monitoring of Cement Paste Using Electromechanical Impedance of Piezoelectric Patch
JC Lee, CY Yi
Materials 15 (22), 8114, 2022
32022
Methodology for Selecting Optimal Earthmoving Haul-Routes using Genetic Algorithm
HS Gwak, CY Yi, DE Lee
Proceedings of the Korean Institute of Building Construction Conference, 4-5, 2014
32014
Stochastic flame locating method hybridizing Kalman filter and deep neural network for rapid fire response at construction sites
JH Kim, YJ Park, CY Yi, DE Lee
Journal of Building Engineering 66, 105967, 2023
22023
Eco-Economic Performance Estimation Method for Pretensioned Spun High-Strength Concrete Pile Installation
CY Yi, JY Park, CY Park, JC Lee, YJ Park
Sustainability 14 (19), 11990, 2022
22022
Methodology for Estimating Stochastic CO2 Emission for Construction Operation
CY Yi, HS Gwak, DE Lee
Journal of the Architectural Institute of Korea Structure & Construction 30 …, 2014
22014
Multi-objective Optimization System for Time-Cost-Environment-Quality Trade-off in Construction Project
DE Lee, CY Yi, HS Gwak
Journal of the Architectural Institute of Korea Structure & Construction 31 …, 2015
12015
Time of Flight Distance Sensor–Based Construction Equipment Activity Detection Method
YJ Park, CY Yi
Applied Sciences 14 (7), 2859, 2024
2024
Parametric Image-Based Concrete Defect Assessment Method
DE Lee, G Hong, M Maruthi, CY Yi, YJ Park
Case Studies in Construction Materials, e02962, 2024
2024
A Comparison Study of Edge Line Estimation Algorithms for Dimensional Quality Assessment of Precast Concrete Slabs
CY Yi, F Li, JPP Thedja, SH Sim, YK Choi, GH Kim, MK Kim
Advances in Civil Engineering 2024, 2024
2024
Contingency Estimation Method based on Stochastic Earned Value Management System
HS Gwak, BY Choi, CY Yi, DE Lee
Proceedings of the Korean Institute of Building Construction Conference, 72-73, 2018
2018
The system can't perform the operation now. Try again later.
Articles 1–20