Follow
Daniel Sánchez Herranz
Daniel Sánchez Herranz
Research Engineer, University of Granada
Verified email at ugr.es
Title
Cited by
Cited by
Year
Preliminary design of the HEBT of IFMIF DONES
O Nomen, D Sanchez-Herranz, C Oliver, I Podadera, R Varela, F Ogando, ...
Fusion Engineering and Design 153, 111515, 2020
212020
The accelerator system of IFMIF-DONES multi-MW facility
I Podadera, A Ibarra, D Jiménez-Rey, J Molla, C de la Morena, C Oliver, ...
Proc. IPAC’21, 1910-1913, 2021
142021
Design of the HEBT components inside TIR room of the IFMIF DONES facility
D Sánchez-Herranz, O Nomen, F Arranz, S Coloma, I Podadera, R Varela
Fusion Engineering and Design 168, 112636, 2021
82021
Beam diagnostics for the multi-MW high energy beam transport line of DONES
I Podadera, A Ibarra, D Jiménez-Rey, J Mollá, C Oliver, R Varela, ...
Proc. 8th Int. Beam Instrumentation Conf.(IBIC’19), 200-204, 2019
82019
Logistics and maintenance research activities for DONES facility
F Arranz, T Lehmann, F Rauscher, G Fischer, S Koehler, J Garrido, ...
Fusion Engineering and Design 192, 113630, 2023
72023
Remote handling in the accelerator systems of DONES
F Arranz, G Micciche, S Coloma, D Sánchez-Herranz, O Nomen, M Ferre, ...
IEEE Transactions on Plasma Science 48 (6), 1743-1747, 2020
72020
Impact of the Magnet Alignment and Field Errors on the Output Uniform Beam at the DONES HEBT line
C Oliver, A Ibarra, J Molla, I Podadera, R Varela, H Dzitko, O Nomen, ...
Proc. IPAC’21, 3251-3253, 2021
62021
Status of the engineering design of the IFMIF-DONES high energy beam transport line and beam dump system
D Sánchez-Herranz, O Nomen, M Sanmartí, BK Singh, F Arranz, ...
Journal of Physics: Conference Series 2420 (1), 012080, 2023
52023
Commissioning plan of the IFMIFDONES accelerator
I Podadera, A Ibarra, M Weber, B Bolzon, N Chauvin, S Chel, A Madur, ...
Proc. LINAC’22, 330-333, 2022
52022
Design and configurations for the Shielding of the Beam Dump of IFMIF DONES
D Sanchez-Herranz, P Ortego, O Nomen, B Branas, F Ogando, P Sauvan, ...
Fusion Engineering and Design 153, 111475, 2020
42020
Overview of IFMIF-DONES diagnostics: Requirements and techniques
C Torregrosa-Martin, A Ibarra, J Aguilar, F Ambi, F Arranz, F Arbeiter, ...
Fusion engineering and design 191, 113556, 2023
32023
Remote handling maintenance of beam dump in IFMIF-DONES
S Coloma, M Ferre, F Arranz, G Miccichè, D Sánchez-Herranz, O Nomen, ...
Fusion Engineering and Design 165, 112216, 2021
22021
Beam-facing material selection for mitigation of residual doses in the HEBT of IFMIF-DONES
F Ogando, L Macia, V Lopez, I Podadera, D Sanchez-Herranz
Nuclear Materials and Energy 38, 101592, 2024
12024
Configuration and Engineering Integration in the IFMIF-DONES Project
D Sánchez-Herranz, J Aguilar, A Moreno, W Krolas
IPAC, 0
1
Engineering design status of IFMIF-DONES High Energy Beam Transport line and Beam Dump system inside the TIR and RIZ
L Macià, O Nomen, M Sanmartí, D Sánchez-Herranz, C Torregrosa-Martin, ...
Fusion Engineering and Design 202, 114312, 2024
2024
Alignment strategy for IFMIF-DONES facility
F Arranz, S Becerril, D Bernardi, T Dezsi, J Gutierrez, M Garcia, J Maestre, ...
Fusion Engineering and Design 200, 114181, 2024
2024
Pee Power Urinal–Microbial Fuel Cell Technology Field Trials In The Context Of Sanitation 2
GP Merino-Jimenez, D Sanchez-Herranz, J Greenman
The system can't perform the operation now. Try again later.
Articles 1–17