Overall equipment efficiency improvement using time study in an aerospace industry AP Puvanasvaran, CZ Mei, VA Alagendran Procedia Engineering 68, 271-277, 2013 | 118 | 2013 |
The roles of communication process for an effective lean manufacturing implementation P Puvanasvaran, H Megat, T Sai Hong, M Mohd Razali Journal of industrial engineering and management 2 (1), 128-152, 2009 | 115 | 2009 |
Employability Skills Assessment Tool Development. MS Rasul, RAA Rauf, AN Mansor, AP Puvanasvaran International Education Studies 5 (5), 43-56, 2012 | 83 | 2012 |
A review of problem solving capabilities in lean process management AP Puvanasvaran, MR Muhamad, M Megat, SH Tang, AMS Hamouda Science Publications, 2008 | 77 | 2008 |
Mechanical properties of kenaf/polyester composites MY Yuhazri, PT Phongsakorn, H Sihombing, AR Jeefferie, P Perumal, ... International Journal of Engineering and Technology 11 (1), 127-131, 2011 | 71 | 2011 |
Consideration of demand rate in Overall Equipment Effectiveness (OEE) on equipment with constant process time P Puvanasvaran, YS Teoh, CC Tay Journal of Industrial Engineering and Management 6 (2), 507-524, 2013 | 46 | 2013 |
Lean principles adoption in environmental management system (EMS)-ISO 14001 P Puvanasvaran, RKS Tian, V Suresh, M Muhamad Journal of Industrial Engineering and Management 5 (2), 406-430, 2012 | 36 | 2012 |
Lean process management implementation through enhanced problem solving capabilities P Perumal, H Megat, T Sai Hong, M Mohd Razali, A Magid, S Hamouda Journal of Industrial Engineering and Management 3 (3), 447-493, 2010 | 36 | 2010 |
Risk assessment method for insider threats in cyber security: A review NA Hashim, ZZ Abidin, AP Puvanasvaran, NA Zakaria, R Ahmad International Journal of Advanced Computer Science and Applications 9 (11), 2018 | 32 | 2018 |
Development of lean manufacturing implementation framework in machinery and equipment SMEs CJ Yuik, P Puvanasvaran International Journal of Industrial Engineering and Management 11 (3), 157-169, 2020 | 28 | 2020 |
MNH; Yoong, SS (2018) AP Puvanasvaran, A Hamid Cycle time reduction for coil setup process through standard work: case …, 0 | 28 | |
A case study of kaizen implementation in SMI AP Puvanasvaran, ST Kerk, AR Ismail Proceedings of the National Conference in Mechanical Engineering Research …, 2010 | 27 | 2010 |
Integration of poka yoke into process failure mode and effect analysis: A case study AP Puvanasvaran, N Jamibollah, N Norazlin American Journal of Applied Sciences 11 (8), 1332, 2014 | 26 | 2014 |
Lean environmental management integration system for sustainability of ISO 14001: 2004 standard implementation P Puvanasvaran, RKS Tian, A Suresh, L Vasu Journal of Industrial Engineering and Management 7 (5), 1124-1144, 2014 | 25 | 2014 |
Exploring critical success factors for the implementation of lean manufacturing in machinery and equipment SMEs CJ Yuik, PA Perumal, CJ Feng Engineering Management in Production and Services 12 (4), 77-91, 2020 | 23 | 2020 |
Principles and business improvement initiatives of lean relates to Environmental Management System AP Puvanasvaran, RST Kerk, MR Muhamad First International Technology Management Conference, 439-444, 2011 | 21 | 2011 |
A review of purpose, benefits, impediments and structure of environmental management system (EMS) AP Puvanasvaran, MR Muhamad, RST Kerk Australia Journal of Basic and Applied Sciences 4 (10), 4710-4716, 2010 | 18 | 2010 |
Lean behavior in implementing lean process management AP Puvanasvaran, M Megat, SH Tang, MR Muhamad, AMS Hamouda INSInet Publication, 2009 | 16 | 2009 |
Invisibility of impact from customer demand and relations between processes in Overall Equipment Effectiveness (OEE) YS Teoh, T Ito, P Perumal Journal of Advanced Mechanical Design, Systems, and Manufacturing 11 (5 …, 2017 | 13 | 2017 |
Overall equipment efficiency (OEE) improvement through integrating quality tool: case study P Puvanasvaran, CY Kim, TY Siang Proc. IDECON, no. October, 15-16, 2012 | 13 | 2012 |