Follow
Mohammad Ali Beheshtinia
Mohammad Ali Beheshtinia
Verified email at semnan.ac.ir
Title
Cited by
Cited by
Year
A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain
SH Zegordi, INK Abadi, MA Beheshti-Nia
Computers & Industrial Engineering 58 (3), 373-381, 2010
1542010
A fuzzy QFD approach using SERVQUAL and Kano models under budget constraint for hotel services
MA Beheshtinia, M Farzaneh Azad
Total Quality Management & Business Excellence 30 (7-8), 808-830, 2019
892019
A hybrid MCDM approach for performance evaluation in the banking industry
MA Beheshtinia, S Omidi
Kybernetes 46 (8), 1386-1407, 2017
862017
Hybrid flow shop scheduling with parallel batching
MR Amin-Naseri, MA Beheshti-Nia
International Journal of Production Economics 117 (1), 185-196, 2009
762009
A multi-population genetic algorithm for transportation scheduling
SH Zegordi, MA Beheshti-Nia
Transportation Research Part E: Logistics and Transportation Review 45 (6 …, 2009
622009
Evaluating and prioritizing hospital service quality
A Torkzad, MA Beheshtinia
International journal of health care quality assurance 32 (2), 332-346, 2019
592019
Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
SH Zegordi, MA Beheshti-Nia
The International Journal of Advanced Manufacturing Technology 44 (9-10 …, 2009
462009
A developed genetic algorithm for solving the multi-objective supply chain scheduling problem
A Borumand, MA Beheshtinia
Kybernetes 47 (7), 1401-1419, 2018
442018
A holistic fuzzy approach to create competitive advantage via quality management in services industry (case study: life-insurance services)
J Vaziri, MA Beheshtinia
Management decision 54 (8), 2035-2062, 2016
432016
Supply chain scheduling and routing in multi-site manufacturing system (case study: a drug manufacturing company)
MA Beheshtinia, A Ghasemi, M Farokhnia
Journal of Modelling in Management 13 (1), 27-49, 2018
402018
A multi-objective and integrated model for supply chain scheduling optimization in a multi-site manufacturing system
MA Beheshtinia, A Ghasemi
Engineering Optimization 50 (9), 1415-1433, 2018
372018
A novel MCDM model for prioritizing the renewable power plants’ construction
F Sedady, MA Beheshtinia
Management of Environmental Quality: An International Journal 30 (2), 383-399, 2019
362019
Proposing a new hybrid multi-criteria decision-making approach for road maintenance prioritization
S Sayadinia, MA Beheshtinia
International Journal of Quality & Reliability Management 38 (8), 1661-1679, 2021
292021
An integrated approach for healthcare services risk assessment and quality enhancement
M Pourmadadkar, MA Beheshtinia, K Ghods
International Journal of Quality & Reliability Management 37 (9/10), 1183-1208, 2020
152020
A genetic algorithm developed for a supply chain scheduling problem
SMR Taheri, MA Beheshtinia
Interdisciplinary Journal of Management Studies (Formerly known as Iranian …, 2019
152019
A three-dimensional house: extending quality function deployment in two organizations
M Farokhnia, MA Beheshtinia
Management Decision 57 (7), 1589-1608, 2019
142019
Multi-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects
N Farazmand, M Beheshtinia
Journal of Industrial and Systems Engineering 11 (3), 102-125, 2018
142018
A novel hybrid fuzzy multi-criteria decision-making model for supplier selection problem (A case study in advertising industry)
M Beheshtinia, V Nemati-Abozar
Journal of Industrial and Systems Engineering 9 (4), 65-79, 2017
142017
A robust possibilistic programming model for production-routing problem in a three-echelon supply chain
MA Beheshtinia, N Salmabadi, S Rahimi
Journal of Modelling in Management 16 (4), 1328-1357, 2021
132021
Optimization of delay time and environmental pollution in scheduling of production and transportation system: A novel multi-society genetic algorithm approach
M Moghimi, MA Beheshtinia
Management Research Review 44 (10), 1427-1453, 2021
132021
The system can't perform the operation now. Try again later.
Articles 1–20