Follow
Mohammad Ali Beheshtinia
Mohammad Ali Beheshtinia
Verified email at semnan.ac.ir
Title
Cited by
Cited by
Year
A novel genetic algorithm for solving production and transportation scheduling in a two-stage supply chain
SH Zegordi, INK Abadi, MA Beheshti-Nia
Computers & Industrial Engineering 58 (3), 373-381, 2010
1552010
A fuzzy QFD approach using SERVQUAL and Kano models under budget constraint for hotel services
MA Beheshtinia, M Farzaneh Azad
Total Quality Management & Business Excellence 30 (7-8), 808-830, 2019
872019
A hybrid MCDM approach for performance evaluation in the banking industry
MA Beheshtinia, S Omidi
Kybernetes 46 (8), 1386-1407, 2017
842017
Hybrid flow shop scheduling with parallel batching
MR Amin-Naseri, MA Beheshti-Nia
International Journal of Production Economics 117 (1), 185-196, 2009
752009
A multi-population genetic algorithm for transportation scheduling
SH Zegordi, MA Beheshti-Nia
Transportation Research Part E: Logistics and Transportation Review 45 (6 …, 2009
612009
Evaluating and prioritizing hospital service quality
A Torkzad, MA Beheshtinia
International journal of health care quality assurance 32 (2), 332-346, 2019
542019
Integrating production and transportation scheduling in a two-stage supply chain considering order assignment
SH Zegordi, MA Beheshti-Nia
The International Journal of Advanced Manufacturing Technology 44 (9-10 …, 2009
472009
A developed genetic algorithm for solving the multi-objective supply chain scheduling problem
A Borumand, MA Beheshtinia
Kybernetes 47 (7), 1401-1419, 2018
442018
Supply chain scheduling and routing in multi-site manufacturing system (case study: a drug manufacturing company)
MA Beheshtinia, A Ghasemi, M Farokhnia
Journal of Modelling in Management 13 (1), 27-49, 2018
412018
A holistic fuzzy approach to create competitive advantage via quality management in services industry (case study: life-insurance services)
J Vaziri, MA Beheshtinia
Management decision 54 (8), 2035-2062, 2016
412016
A multi-objective and integrated model for supply chain scheduling optimization in a multi-site manufacturing system
MA Beheshtinia, A Ghasemi
Engineering Optimization 50 (9), 1415-1433, 2018
362018
A novel MCDM model for prioritizing the renewable power plants’ construction
F Sedady, MA Beheshtinia
Management of Environmental Quality: An International Journal 30 (2), 383-399, 2019
352019
Proposing a new hybrid multi-criteria decision-making approach for road maintenance prioritization
S Sayadinia, MA Beheshtinia
International Journal of Quality & Reliability Management 38 (8), 1661-1679, 2021
272021
A genetic algorithm developed for a supply chain scheduling problem
SMR Taheri, MA Beheshtinia
Interdisciplinary Journal of Management Studies (Formerly known as Iranian …, 2019
172019
An integrated approach for healthcare services risk assessment and quality enhancement
M Pourmadadkar, MA Beheshtinia, K Ghods
International Journal of Quality & Reliability Management 37 (9/10), 1183-1208, 2020
142020
A three-dimensional house: extending quality function deployment in two organizations
M Farokhnia, MA Beheshtinia
Management Decision 57 (7), 1589-1608, 2019
142019
Multi-objective optimization of time-cost-quality-carbon dioxide emission-plan robustness in construction projects
N Farazmand, M Beheshtinia
Journal of Industrial and Systems Engineering 11 (3), 102-125, 2018
142018
A novel hybrid fuzzy multi-criteria decision-making model for supplier selection problem (A case study in advertising industry)
M Beheshtinia, V Nemati-Abozar
Journal of Industrial and Systems Engineering 9 (4), 65-79, 2017
142017
A robust possibilistic programming model for production-routing problem in a three-echelon supply chain
MA Beheshtinia, N Salmabadi, S Rahimi
Journal of Modelling in Management 16 (4), 1328-1357, 2021
132021
Optimization of delay time and environmental pollution in scheduling of production and transportation system: A novel multi-society genetic algorithm approach
M Moghimi, MA Beheshtinia
Management Research Review 44 (10), 1427-1453, 2021
122021
The system can't perform the operation now. Try again later.
Articles 1–20