关注
Sheng-Long Jiang
标题
引用次数
引用次数
年份
A bi-layer optimization approach for a hybrid flow shop scheduling problem involving controllable processing times in the steelmaking industry
S Jiang, M Liu, J Hao, W Qian
Computers & Industrial Engineering 87, 518-531, 2015
742015
A multi-objective optimization approach for integrated production planning under interval uncertainties in the steel industry
J Lin, M Liu, J Hao, S Jiang
Computers & Operations Research 72, 189-203, 2016
672016
Energy-oriented scheduling for hybrid flow shop with limited buffers through efficient multi-objective optimization
SL Jiang, L Zhang
Ieee Access 7, 34477-34487, 2019
552019
A prediction-based online soft scheduling algorithm for the real-world steelmaking-continuous casting production
S Jiang, M Liu, J Lin, H Zhong
Knowledge-Based Systems 111, 159-172, 2016
472016
A soft-decision based two-layered scheduling approach for uncertain steelmaking-continuous casting process
J Hao, M Liu, S Jiang, C Wu
European Journal of Operational Research 244 (3), 966-979, 2015
432015
Two-stage robust optimization approach for flexible oxygen distribution under uncertainty in integrated iron and steel plants
SL Jiang, G Peng, IDL Bogle, Z Zheng
Applied Energy 306, 118022, 2022
352022
A two-phase soft optimization method for the uncertain scheduling problem in the steelmaking industry
S Jiang, M Liu, J Hao
IEEE Transactions on Systems, Man, and Cybernetics: Systems 47 (3), 416-431, 2016
322016
A preference-inspired multi-objective soft scheduling algorithm for the practical steelmaking-continuous casting production
SL Jiang, Z Zheng, M Liu
Computers & Industrial Engineering 115, 582-594, 2018
252018
Gaussian process-based hybrid model for predicting oxygen consumption in the converter steelmaking process
SL Jiang, X Shen, Z Zheng
Processes 7 (6), 352, 2019
222019
A multi-stage dynamic soft scheduling algorithm for the uncertain steelmaking-continuous casting scheduling problem
S Jiang, Z Zheng, M Liu
Applied Soft Computing 60, 722-736, 2017
222017
基于 UML 的炼钢物流仿真系统分析与设计
蒋胜龙, 郑忠, 高小强, 何腊梅
系统仿真学报 19 (16), 3676-3679, 2007
16*2007
An operation-group based soft scheduling approach for uncertain semiconductor wafer fabrication system
H Zhong, M Liu, J Hao, S Jiang
IEEE Transactions on Systems, Man, and Cybernetics: Systems 48 (8), 1332-1347, 2017
102017
A self-learning based dynamic multi-objective evolutionary algorithm for resilient scheduling problems in steelmaking plants
SL Jiang, Q Liu, IDL Bogle, Z Zheng
IEEE Transactions on Automation Science and Engineering 20 (2), 832-845, 2022
72022
Robust estimation of Wiener models in the presence of outliers using the VB approach
Q Liu, W Lin, S Jiang, Y Chai, L Sun
IEEE Transactions on Industrial Electronics 68 (11), 11390-11399, 2020
72020
A decomposition-based two-stage online scheduling approach and its integrated system in the hybrid flow shop of steel industry
SL Jiang, C Xu, L Zhang, Y Ma
Expert Systems with Applications 213, 119200, 2023
62023
A knowledge-based NSGA-II algorithm for multi-objective hot rolling production scheduling under flexible time-of-use electricity pricing
L Chen, L Cao, Y Wen, H Chen, SL Jiang
Journal of Manufacturing Systems 69, 255-270, 2023
52023
An improved pareto local search for solving bi-objective scheduling problems in hot rolling mills
SL Jiang, W Li, X Zhang, C Xu
Computers & Industrial Engineering 172, 108561, 2022
52022
An integrated planning approach based on harmony search algorithm and prediction model for steelmaking-continuous casting-hot rolling process
L Jianhua, H Jinghua, L Min, J Shenglong
Proceeding of the 11th World Congress on Intelligent Control and Automation …, 2014
52014
Digital twin-enabled production optimization for steel industry
G Peng, Y Cheng, X Zhang, D Xu, S Jiang
2022 IEEE 25th International Conference on Computer Supported Cooperative …, 2022
42022
Investigating the Trade-Off between Design and Operational Flexibility in Continuous Manufacturing of Pharmaceutical Tablets: A Case Study of the Fluid Bed Dryer
SL Jiang, LG Papageorgiou, IDL Bogle, VM Charitopoulos
Processes 10 (3), 454, 2022
32022
系统目前无法执行此操作,请稍后再试。
文章 1–20