Follow
Boray Huang
Boray Huang
University of Dundee School of Business
Verified email at dundee.ac.uk - Homepage
Title
Cited by
Cited by
Year
Production control policies in supply chains with selective-information sharing
B Huang, SMR Iravani
Operations Research 53 (4), 662-674, 2005
502005
The impacts of carbon tariff on green supply chain design
Y Zhou, DC Gong, B Huang, BA Peters
IEEE Transactions on Automation Science and Engineering 14 (3), 1542-1555, 2015
432015
Supporting small suppliers through buyer-backed purchase order financing
B Huang, A Wu, D Chiang
International Journal of Production Research 56 (18), 6066-6089, 2018
362018
A make-to-stock system with multiple customer classes and batch ordering
B Huang, SMR Iravani
Operations Research 56 (5), 1312-1320, 2008
362008
Optimal production and rationing decisions in supply chains with information sharing
B Huang, SMR Iravani
Operations Research Letters 35 (5), 669-676, 2007
332007
EOQ model with batch demand and planned backorders
B Huang, A Wu
Applied Mathematical Modelling 40 (9-10), 5482-5496, 2016
252016
Determining the conditions for reverse triage in emergency medical services using queuing theory
J Xie, P Cao, B Huang, MEH Ong
International Journal of Production Research 54 (11), 3347-3364, 2016
222016
The effects of lumpy demand and shipment size constraint: A response to “Revisit the note on supply chain integration in vendor-managed inventory”
B Huang, Z Ye
Decision Support Systems 48 (2), 421-425, 2010
192010
Support SME suppliers through buyer-backed purchase order financing
A Wu, B Huang, D Chiang
Available at SSRN 2462521, 2014
162014
Portfolio optimization with transaction costs: a two-period mean-variance model
YH Fu, KM Ng, B Huang, HC Huang
Annals of Operations Research 233, 135-156, 2015
152015
Condition-based maintenance for systems under dependent competing failures
LP Chen, ZS Ye, B Huang
2011 IEEE International Conference on Industrial Engineering and Engineering …, 2011
102011
On a multi-product lot scheduling problem subject to an imperfect process with standby modules
GC Lin, A Wu, DC Gong, B Huang, WN Ma
International Journal of Production Research 52 (8), 2243-2257, 2014
52014
Reduce shortage with self-reservation policy for a manufacturer paying both fixed and variable stockout expenditure
B Huang, A Wu
European Journal of Operational Research 262 (3), 944-953, 2017
42017
Cyclic change of server's performance: impacts and applications
B Huang, J Xie, QM He
IEEE Transactions on Automatic Control 59 (3), 703-713, 2013
22013
Jointly consider acquisition price, trade in rebate and selling price in remanufacturing
L Jing, B Huang
Re-engineering Manufacturing for Sustainability: Proceedings of the 20th …, 2013
22013
Optimal production-inventory policies in supply chains with information sharing
B Huang
Northwestern University, 2004
12004
Pricing strategies of remanufacturing business with replacement purchase
L Jing, B Huang, XM Yuan
HandBook of Manufacturing Engineering and Technology, 3291-3311, 2015
2015
A Stochastic Approach to Appointment Sequencing
AR Pourghaderi, B Huang
2014
虛擬亂數指派策略下-模擬模式, 再次模式與實驗設計的相互關係的探討
WT Song, CC Su, B Huang
Journal of the Chinese Institute of Industrial Engineers 12 (3), 1995
1995
The system can't perform the operation now. Try again later.
Articles 1–19