Production control policies in supply chains with selective-information sharing B Huang, SMR Iravani Operations Research 53 (4), 662-674, 2005 | 50 | 2005 |
The impacts of carbon tariff on green supply chain design Y Zhou, DC Gong, B Huang, BA Peters IEEE Transactions on Automation Science and Engineering 14 (3), 1542-1555, 2015 | 43 | 2015 |
Supporting small suppliers through buyer-backed purchase order financing B Huang, A Wu, D Chiang International Journal of Production Research 56 (18), 6066-6089, 2018 | 36 | 2018 |
A make-to-stock system with multiple customer classes and batch ordering B Huang, SMR Iravani Operations Research 56 (5), 1312-1320, 2008 | 36 | 2008 |
Optimal production and rationing decisions in supply chains with information sharing B Huang, SMR Iravani Operations Research Letters 35 (5), 669-676, 2007 | 33 | 2007 |
EOQ model with batch demand and planned backorders B Huang, A Wu Applied Mathematical Modelling 40 (9-10), 5482-5496, 2016 | 25 | 2016 |
Determining the conditions for reverse triage in emergency medical services using queuing theory J Xie, P Cao, B Huang, MEH Ong International Journal of Production Research 54 (11), 3347-3364, 2016 | 22 | 2016 |
The effects of lumpy demand and shipment size constraint: A response to “Revisit the note on supply chain integration in vendor-managed inventory” B Huang, Z Ye Decision Support Systems 48 (2), 421-425, 2010 | 19 | 2010 |
Support SME suppliers through buyer-backed purchase order financing A Wu, B Huang, D Chiang Available at SSRN 2462521, 2014 | 16 | 2014 |
Portfolio optimization with transaction costs: a two-period mean-variance model YH Fu, KM Ng, B Huang, HC Huang Annals of Operations Research 233, 135-156, 2015 | 15 | 2015 |
Condition-based maintenance for systems under dependent competing failures LP Chen, ZS Ye, B Huang 2011 IEEE International Conference on Industrial Engineering and Engineering …, 2011 | 10 | 2011 |
On a multi-product lot scheduling problem subject to an imperfect process with standby modules GC Lin, A Wu, DC Gong, B Huang, WN Ma International Journal of Production Research 52 (8), 2243-2257, 2014 | 5 | 2014 |
Reduce shortage with self-reservation policy for a manufacturer paying both fixed and variable stockout expenditure B Huang, A Wu European Journal of Operational Research 262 (3), 944-953, 2017 | 4 | 2017 |
Cyclic change of server's performance: impacts and applications B Huang, J Xie, QM He IEEE Transactions on Automatic Control 59 (3), 703-713, 2013 | 2 | 2013 |
Jointly consider acquisition price, trade in rebate and selling price in remanufacturing L Jing, B Huang Re-engineering Manufacturing for Sustainability: Proceedings of the 20th …, 2013 | 2 | 2013 |
Optimal production-inventory policies in supply chains with information sharing B Huang Northwestern University, 2004 | 1 | 2004 |
Pricing strategies of remanufacturing business with replacement purchase L Jing, B Huang, XM Yuan HandBook of Manufacturing Engineering and Technology, 3291-3311, 2015 | | 2015 |
A Stochastic Approach to Appointment Sequencing AR Pourghaderi, B Huang | | 2014 |
虛擬亂數指派策略下-模擬模式, 再次模式與實驗設計的相互關係的探討 WT Song, CC Su, B Huang Journal of the Chinese Institute of Industrial Engineers 12 (3), 1995 | | 1995 |