Follow
Taha Keshavarz
Taha Keshavarz
Assistant Professor of Industrial Engineering, Semnan University, Iran
Verified email at semnan.ac.ir
Title
Cited by
Cited by
Year
Just-in-time scheduling in identical parallel machine sequence-dependent group scheduling problem
A Goli, T Keshavarz
Journal of Industrial and Management Optimization 18 (6), 3807-3830, 2022
582022
A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties
T Keshavarz, M Savelsbergh, N Salmasi
Applied Mathematical Modelling 39 (20), 6410-6424, 2015
402015
Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem
T Keshavarz, N Salmasi, M Varmazyar
Annals of Operations Research 226, 351-377, 2015
362015
Flowshop sequence-dependent group scheduling with minimisation of weighted earliness and tardiness
T Keshavarz, N Salmasi, M Varmazyar
European Journal of Industrial Engineering 13 (1), 54-80, 2019
352019
Makespan minimisation in flexible flowshop sequence-dependent group scheduling problem
T Keshavarz, N Salmasi
International Journal of Production Research 51 (20), 6182-6193, 2013
352013
Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems
T Keshavarz, N Salmasi
European Journal of Industrial Engineering 8 (3), 366-387, 2014
202014
A hybrid neural network approach to minimize total completion time on a single batch processing machine
N Rafiee Parsa, T Keshavarz, B Karimi, SM Moattar Husseini
International Transactions in Operational Research, 2019
122019
Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times to Minimize Makespan and Tariff Charged Energy Consumption
T Keshavarz, E Karimi, M Shakhsi-Niaei
Advances in Industrial Engineering 55 (1), 91-113, 2021
42021
A lower bounding method for earliness and tardiness minimization on a single batch processing machine
T Keshavarz
Journal of Industrial and Systems Engineering 13 (2), 9-26, 2020
32020
INTEGRATING PRODUCTION SCHEDULING, DELIVERY, AND 3D LOADING PROBLEMS IN A TWO-STAGE SUPPLY CHAIN.
T Keshavarz, Z Noormohamadzade, MB Fakhrzad
International Journal of Industrial Engineering 27 (6), 2020
12020
The Impact of Marketing Capabilities on Export Performance by Considering the Role of Competitive Advantage Using the Structural Equations Method (Case Study: Food Export …
T Keshavarz, MR Amuzadeh
Sharif Journal of Industrial Engineering & Management, 2025
2025
Scheduling a batch processing machine in a just-in-time production system by considering a tight due date
T Keshavarz, H Zarabadipour
Research in Production and Operations Management, 2024
2024
D‌E‌V‌E‌L‌O‌P‌I‌N‌G A‌N I‌N‌T‌E‌G‌R‌A‌T‌E‌D M‌O‌D‌E‌L F‌O‌R P‌R‌I‌C‌I‌N‌G A‌N‌D I‌N‌V‌E‌N‌T‌O‌R‌Y C‌O‌N‌T‌R‌O‌L O‌F P‌E‌R‌I‌S‌H‌A‌B‌L‌E G‌O‌O‌D‌S I‌N A T‌W‌O-S‌T‌A‌G‌E S‌U‌P‌P‌L‌Y C‌H‌A‌I‌N: A C‌A‌S‌E S‌T‌U‌D‌Y O‌F G‌R‌E‌E‌N M‌O‌R‌T‌A‌R
T Keshavarz, M Farasat
Sharif Journal of Industrial Engineering & Management 39 (1), 35-48, 2023
2023
Developing an Integrated Model for Pricing and Inventory Control of Perishable Goods in a Two-Stage Supply Chain: A Case Study of Green Mortar
T Keshavarz, M Farasat
Sharif Journal of Industrial Engineering & Management, 2023
2023
Analyzing the impact of COVID-19 on the supply chain of E-commerce Companies
O Solatinejad, T Keshavarz
Journal of International Business Administration 5 (3), 181-199, 2022
2022
Efficient Algorithms for Just-In-Time Scheduling on a Batch Processing Machine
T Keshavarz, N Rafiee Parsa
Journal of Operational Research In Its Applications (Applied Mathematics …, 2021
2021
A Memetic Algorithm for Flexible Flow Shop Sequence Dependent Group Scheduling Problem
TY Keshavarz, N Salmasi, R Logendran
IIE Annual Conference. Proceedings, 1, 2010
2010
Modeling the rational behavior of buyers and sellers in an E-commerce system using agent-based simulation
M Ghanbari, T Keshavarz, M Shakhsi-Niaei
Journal of International Business Administration 6 (4), 81-101, 2000
2000
Pricing Model in Competitive Dual-Channel Supply Chain with Considering Outsourcing Strategy under Uncertainty
TY Keshavarz, HR Kechidi, M Honarvar
The system can't perform the operation now. Try again later.
Articles 1–19