Follow
Seyed Mohammad Hassan Hosseini (ORCID: 0000-0002-6164-3179)
Seyed Mohammad Hassan Hosseini (ORCID: 0000-0002-6164-3179)
Verified email at shahroodut.ac.ir
Title
Cited by
Cited by
Year
A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations
P Fattahi, SMH Hosseini, F Jolai, R Tavakkoli-Moghaddam
Applied Mathematical Modelling 38 (1), 119-134, 2014
1182014
A mathematical model and extension algorithm for assembly flexible flow shop scheduling problem
P Fattahi, SMH Hosseini, F Jolai
The International Journal of Advanced Manufacturing Technology 65, 787-802, 2013
672013
Suicide and associated risk factors in Hamadan province, west of Iran, in 2008 and 2009
B Amiri, A Pourreza, AR Foroushani, SM Hosseini, J Poorolajal
Journal of research in health sciences 12 (2), 88-92, 2012
662012
The impact of digital marketing strategies on customer’s buying behavior in online shopping using the rough set theory
E Forghani, R Sheikh, SMH Hosseini, SS Sana
International journal of system assurance engineering and management 13 (2 …, 2022
502022
A bi-objective flexible flow shop scheduling problem with machine-dependent processing stages: Trade-off between production costs and energy consumption
A Hasani, SMH Hosseini
Applied Mathematics and Computation 386, 125533, 2020
462020
Assessing the agility of hospitals in disaster management: application of interval type-2 fuzzy Flowsort inference system
A Moheimani, R Sheikh, SMH Hosseini, SS Sana
Soft Computing 25, 3955-3974, 2021
382021
Assessing the preparedness of hospitals facing disasters using the rough set theory: guidelines for more preparedness to cope with the COVID-19
A Moheimani, R Sheikh, SMH Hosseini, SS Sana
International Journal of Systems Science: Operations & Logistics 9 (3), 339-354, 2022
352022
Policy-making for renewable energy sources in search of sustainable development: A hybrid DEA-FBWM approach
M Kolagar, SMH Hosseini, R Felegari, P Fattahi
Environment Systems and Decisions 40, 485-509, 2020
352020
Damage to natural regeneration in the Hyrcanian forests of Iran: a comparison of two typical timber extraction operations
SM Hosseini, B Madjnonian, M Nieuwenhuis
Journal of forest engineering 11 (2), 69-73, 2000
272000
An application of quality function deployment and SERVQUAL approaches to enhance the service quality in radiology centres
SS Gavahi, SMH Hosseini, A Moheimani
Benchmarking: An International Journal 30 (5), 1649-1671, 2023
262023
Scheduling in a flexible job shop followed by some parallel assembly stations considering lot streaming
F Daneshamooz, P Fattahi, SMH Hosseini
Engineering Optimization 54 (4), 614-633, 2022
242022
Some heuristics for the hybrid flow shop scheduling problem with setup and assembly operations
P Fattahi, S Hosseini, F Jolai
International Journal of Industrial Engineering Computations 4 (3), 393-416, 2013
202013
Teaching–learning-based genetic algorithm (TLBGA): an improved solution method for continuous optimization problems
F Behroozi, SMH Hosseini, SS Sana
International Journal of System Assurance Engineering and Management 12 (6 …, 2021
142021
A new model for blood supply chain network design in disasters based on hub location approach considering intercity transportation
M Soltani, RA Mohammadi, SMH Hosseini, MM Zanjani
International Journal of Industrial Engineering & Production Research 32 (2 …, 2021
142021
Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines
SMH Hosseini
Journal of Optimization in Industrial Engineering 12 (1), 63-78, 2019
142019
Assembly flow shop scheduling problem considering machine eligibility restrictions and auxiliary resource constraints
SMH Hosseini, SS Sana, M Rostami
International journal of systems science: operations & logistics 9 (4), 512-528, 2022
132022
Exploring the relationship between data analytics capability and competitive advantage: the mediating roles of supply chain resilience and organization flexibility
G Rezaei, SMH Hosseini, SS Sana
Sustainability 14 (16), 10444, 2022
132022
Multi-objective optimization model for blood supply chain network design considering cost of shortage and substitution in disaster
SMH Hosseini, F Behroozi, SS Sana
RAIRO-Operations Research 57 (1), 59-85, 2023
122023
Mathematical modeling and two efficient branch and bound algorithms for job shop scheduling problem followed by an assembly stage
F Daneshamooz, P Fattahi, SMH Hosseini
Kybernetes 50 (12), 3222-3245, 2021
122021
Joint optimisation of the maintenance and buffer stock policies considering back orders
SS Aghdam, P Fattahi, SMH Hosseini, S Babaeimorad, SS Sana
International Journal of Systems Science: Operations & Logistics 10 (1), 2169054, 2023
112023
The system can't perform the operation now. Try again later.
Articles 1–20