Follow
Sanchoy Das
Title
Cited by
Cited by
Year
Modeling the flexibility of order quantities and lead-times in supply chains
SK Das, L Abdel-Malek
International journal of production Economics 85 (2), 171-181, 2003
2942003
An approach for estimating the end-of-life product disassembly effort and cost
SK Das, P Yedlarajiah, R Narendra
International journal of production research 38 (3), 657-673, 2000
2652000
The measurement of flexibility in manufacturing systems
SK Das
International Journal of Flexible Manufacturing Systems 8, 67-93, 1996
1721996
A facility layout method for flexible manufacturing systems
SK Das
The International Journal of Production Research 31 (2), 279-297, 1993
1541993
A genetic algorithm based heuristic for scheduling of virtual manufacturing cells (VMCs)
SE Kesen, SK Das, Z Güngör
Computers & Operations Research 37 (6), 1148-1156, 2010
992010
Process planning for product disassembly
SK Das, S Naik
International journal of production research 40 (6), 1335-1355, 2002
982002
Investigations into the impact of flexibility on manufacturing performance
SK Das, P Nagendra
International Journal of Production Research 31 (10), 2337-2354, 1993
921993
Evaluating the unfastening effort in design for disassembly and serviceability
R Sodhi, M Sonnenberg, S Das
Journal of Engineering Design 15 (1), 69-90, 2004
832004
A master scheduling model with skilled and unskilled temporary workers
A Techawiboonwong, P Yenradee, SK Das
International Journal of Production Economics 103 (2), 798-809, 2006
812006
Design and implementation of flexible manufacturing solutions in agile enterprises
L Abdel‐Malek, SK Das, C Wolf
International Journal of Agile Management Systems 2 (3), 187-195, 2000
772000
Selection of routes in a flexible manufacturing facility
SK Das, P Nagendra
International journal of production economics 48 (3), 237-247, 1997
671997
Evaluating supply chain flexibility with order quantity constraints and lost sales
SE Kesen, A Kanchanapiboon, SK Das
International Journal of Production Economics 126 (2), 181-188, 2010
612010
Design and analysis of a two-stage security screening and inspection system
S Olapiriyakul, S Das
Journal of Air Transport Management 13 (2), 67-74, 2007
602007
Scheduling material handling vehicles in a container terminal
SK Das, L Spasovic
Production Planning & Control 14 (7), 623-633, 2003
502003
An audit tool for determining flexibility requirements in a manufacturing facility
SK Das, P Patel
Integrated Manufacturing Systems 13 (4), 264-274, 2002
502002
Finite capacity scheduling method for MRP with lot size restrictions
PB Nagendra, SK Das
International Journal of Production Research 39 (8), 1603-1623, 2001
482001
A concurrent engineering approach for the development of medical devices
SK Das, JB Almonor
International Journal of Computer Integrated Manufacturing 13 (2), 139-147, 2000
462000
Fulfilment time performance of online retailers–an empirical analysis
J Zhang, S Onal, R Das, A Helminsky, S Das
International Journal of Retail & Distribution Management 47 (5), 493-510, 2019
452019
DFQM-An approach for improving the quality of assembled products
SK Das, V Datla, S Gami
International Journal of Production Research 38 (2), 457-477, 2000
452000
Measuring design-level information quality in online reviews
IA Yagci, S Das
Electronic Commerce Research and Applications 30, 102-110, 2018
442018
The system can't perform the operation now. Try again later.
Articles 1–20