Scheduling projects with repeating activities RB Harris, PG Ioannou Journal of construction engineering and management 124 (4), 269-278, 1998 | 473 | 1998 |
General-purpose systems for effective construction simulation JC Martinez, PG Ioannou Journal of construction engineering and management 125 (4), 265-276, 1999 | 314 | 1999 |
Average-bid method—competitive bidding strategy PG Ioannou, SS Leu Journal of construction engineering and management 119 (1), 131-147, 1993 | 190 | 1993 |
General purpose simulation with stroboscope JC Martinez, PG Ioannou Proceedings of Winter Simulation Conference, 1159-1166, 1994 | 180 | 1994 |
Company and project evaluation model for privately promoted infrastructure projects A Dias Jr, PG Ioannou Journal of Construction Engineering and Management 122 (1), 71-82, 1996 | 152 | 1996 |
Debt capacity and optimal capital structure for privately financed infrastructure projects A Dias Jr, PG Ioannou Journal of Construction Engineering and Management 121 (4), 404-414, 1995 | 128 | 1995 |
Graphical object-oriented discrete-event simulation system LY Liu, PG Ioannou Proceedings of the 24th conference on Winter simulation, 1285-1291, 1992 | 105 | 1992 |
Comparison of construction alternatives using matched simulation experiments PG Ioannou, JC Martinez Journal of construction engineering and management 122 (3), 231-241, 1996 | 94 | 1996 |
Below-average bidding method PG Ioannou, RE Awwad Journal of Construction Engineering and Management 136 (9), 936-946, 2010 | 80 | 2010 |
UM-CYCLONE user’s guide PG Ioannou Dept. of Civil Engineering, The University of Michigan, Ann Arbor, Mich, 1989 | 76 | 1989 |
Geologic prediction model for tunneling PG Ioannou Journal of Construction Engineering and management 113 (4), 569-590, 1987 | 61 | 1987 |
Advanced construction technology system—ACTS PG Ioannou, LY Liu Journal of Construction Engineering and Management 119 (2), 288-306, 1993 | 58 | 1993 |
Repetitive scheduling method: Requirements, modeling, and implementation PG Ioannou, IT Yang Journal of Construction Engineering and Management 142 (5), 04016002, 2016 | 55 | 2016 |
State-based probabilistic scheduling using STROBOSCOPE’s CPM add-on JC Martinez, PG Ioannou Proc., Construction Congress V, 438-445, 1997 | 54 | 1997 |
Bidding models—Symmetry and state of information PG Ioannou Journal of Construction Engineering and Management 114 (2), 214-232, 1988 | 53 | 1988 |
Resource-driven scheduling for repetitive projects: A pull-system approach IT Yang, PG Ioannou Proceedings of the 9th International Group for Lean Construction Conference …, 2001 | 52 | 2001 |
Scheduling system with focus on practical concerns in repetitive projects IT Yang, PG Ioannou Construction Management and Economics 22 (6), 619-630, 2004 | 49 | 2004 |
Advantages of the activity scanning approach in the modeling of complex construction processes JC Martinez, PG Ioannou Proceedings of the 27th conference on Winter simulation, 1024-1031, 1995 | 46 | 1995 |
State and resource based construction process simulation J Martinez, PG Ioannou, RI Carr Computing in civil engineering, 177-184, 1994 | 45 | 1994 |
Resource leveling based on the modified minimum moment heuristic J Martinez, P Ioannou Computing in civil and building engineering, 287-294, 1993 | 44 | 1993 |