متابعة
Mohammed A. Sakr
Mohammed A. Sakr
Tanta University, Faculty of engineering
بريد إلكتروني تم التحقق منه على f-eng.tanta.edu.eg - الصفحة الرئيسية
عنوان
عدد مرات الاقتباسات
عدد مرات الاقتباسات
السنة
Shear strengthening of RC beams using prefabricated ultra-high performance fiber reinforced concrete (UHPFRC) plates: Experimental and numerical investigation
KTMMWN - Sakr M. A., Sleemah A.
Structural concrete journal 20, 1137-1153., 2019
56*2019
Development of shear capacity equations for RC beams strengthened with UHPFRC
W Mansour, M Sakr, A Seleemah, BA Tayeh, T Khalifa
Computers and Concrete 27 (5), 473-487, 2021
452021
Behavior of RC beams strengthened in shear with ultra-high performance fiber reinforced concrete (UHPFRC)
MA Sakr, AA Sleemah, TM Khalifa, WN Mansour
MATEC web of conferences 199, 09002, 2018
392018
Bond behavior between concrete and prefabricated ultra high-performance fiber-reinforced Concrete (UHPFRC) plates
W Mansour, MA Sakr, AA Seleemah, BA Tayeh, TM Khalifa
Structural Engineering and Mechanics 81 (3), 305-316, 2022
382022
Modelling and behaviour of beam-to-column connections under axial force and cyclic bending
S El-Khoriby, MA Sakr, TM Khalifa, MM Eladly
Journal of Constructional Steel Research 129, 171-184, 2017
382017
Analysis of RC columns strengthened with ultra-high performance fiber reinforced concrete jackets under eccentric loading
BO Mohammed A.Sakr , Tamer M.El Korany
Engineering Structures, 2020
312020
Long-term deflection of cracked composite beams with nonlinear partial shear interaction: I—Finite element modeling
MA Sakr, SSS Sakla
Journal of Constructional Steel Research 64 (12), 1446-1455, 2008
312008
Modeling of RC shear walls strengthened with ultra-high performance fiber reinforced concrete (UHPFRC) jackets
MA Sakr, SR El-khoriby, TM Khalifa, MT Nagib
Engineering Structures 200, 109696, 2019
232019
Modeling of RC shear walls strengthened by FRP composites
MA Sakr, SR El-Khoriby, TM Khalifa, MT Nagib
Struct. Eng. Mech 61 (3), 407-417, 2017
232017
Finite element modeling of debonding mechanisms in carbon fiber reinforced polymer‐strengthened reinforced concrete continuous beams
MA Sakr
Structural Concrete 19 (4), 1002-1012, 2018
192018
Long-term deflection of cracked composite beams with nonlinear partial shear interaction—A study using neural networks
MA Sakr, SSS Sakla
Engineering structures 31 (12), 2988-2997, 2009
192009
Cyclic behaviour of squat reinforced concrete shear walls strengthened with ultra-high performance fiber reinforced concrete
MT Nagib, MA Sakr, SR El-khoriby, TM Khalifa
Engineering Structures 246, 112999, 2021
172021
External Strengthening of RC Continuous Beams Using FRP Plates: Finite Element Model
WNM M A Sakr, T M Khalifa
Second International Conference on Advances in Civil, Structural and …, 2015
15*2015
Cyclic behaviour of infilled steel frames with different beam-to-column connection types
MA Sakr, MM Eladly, T Khalifa, S El-Khoriby
Steel and Composite Structures, An International Journal 30 (5), 443-456, 2019
112019
Ultimate behavior of externally prestressed Composite beams with partial shear connection
A Dabaon, A Sakr, K Omnia
Department of Structural Engineering, Ain Shams University, Egypt, 2005
112005
Modeling of ultra-high performance fiber reinforced concrete columns under eccentric loading
MA Sakr, B Osama, TM El Korany
Structures 32, 2195-2210, 2021
92021
Analysis of RC Continuous Beams Strengthened with FRP Plates: A Finite Element Model
MA Sakr, TM Khalifa, WN Mansour
Civil Engineering Journal 2 (11), 576-589, 2016
72016
The shear strength of existing non-seismic RC beam-column joints strengthened with CFRP Sheets: Numerical and analytical study
AG Saad, MA Sakr, TM El-korany
Engineering Structures 291, 116497, 2023
62023
Time-Dependent Analysis of Partially Prestressed Continuous Composite Beams
J Sakr, M., and Lapos
Civil Engineering, Budapest, 1998
6*1998
Interfacial shear behavior between UHPFRC layers and normal concrete substrate for shear-strengthened squat RC shear walls under cyclic loading
MT Nagib, MA Sakr, SR El-khoriby, TM Khalifa
Engineering Structures 254, 113850, 2022
52022
يتعذر على النظام إجراء العملية في الوقت الحالي. عاود المحاولة لاحقًا.
مقالات 1–20