Determination a reasonable concession period for (PPP) projects AH Hadi, KR Erzaij Civil Engineering Journal 5 (6), 1235-1248, 2019 | 17 | 2019 |
Employ 6D-BIM Model Features for Buildings Sustainability Assessment H Hussain, E Kadhim IOP Conference Series: Materials Science and Engineering 901 (1), 012021, 2020 | 11 | 2020 |
Applying Intelligent Portfolio Management to the Evaluation of Stalled Construction Projects KR Erzaij, WA Hatem, BH Maula Open Engineering 10 (1), 552-562, 2020 | 8 | 2020 |
Cost & time interaction behavior on construction materials procurement and execution processes in infrastructure projects AK Majeed, KR Erzaij Civil Engineering Journal 6 (3), 531-539, 2020 | 7 | 2020 |
Performance Evaluation of the Investment Projects during the Implementation Phase (Najaf province as a case study) KR Erzaij, DM Aljanabei Journal of Engineering 22 (8), 54-74, 2016 | 6 | 2016 |
Evaluating implementation of electric power generation projects in Iraq AA Nadhum, KR Erzaij IOP Conference Series: Materials Science and Engineering 901 (1), 012034, 2020 | 5 | 2020 |
Study of the complexity factors associated with the theory of complexity in Iraqi construction projects HF Abbas, KR Erzaij Periodicals of Engineering and Natural Sciences 7 (4), 2034-2044, 2020 | 5 | 2020 |
Application of Building Information Modeling (3D and 4D) in Construction Sector in Iraq KR Erzaij, AA Obaid Journal of Engineering 23 (10), 30-43, 2017 | 5 | 2017 |
Management model for evaluation and selection of engineering equipment suppliers for construction projects in Iraq KR Erzaij, AS Bidan Journal of Engineering 22 (6), 1-16, 2016 | 5 | 2016 |
A spherical fuzzy AHP model for contractor assessment during project life cycle HG Abdulkareem, KR Erzaij Journal of the Mechanical Behavior of Materials 31 (1), 369-380, 2022 | 4 | 2022 |
The effect of desert environment on the cost of construction projects (materials transportation) KR Erzaij, RH Ali Applied Mechanics and Materials 897, 152-156, 2020 | 4 | 2020 |
Nature and Causes of claims in Iraqi turnkey projects KR Erzaij IOP Conference Series: Materials Science and Engineering 745 (1), 012181, 2020 | 4 | 2020 |
Evaluation of Maintenance Management in Iraqi Governmental Buildings HKI 1 Q. M. Doos, 2 K. R. Al-Saadwi Journal of Engineering (Eng. J.) 22 (9), 55-71, 2016 | 4* | 2016 |
Prediction of the Delay in the Portfolio Construction Using Naïve Bayesian Classification Algorithms KR Erzaij, AM Burhan, WA Hatem, RH Ali Civil and Environmental Engineering 17 (2), 673-680, 2021 | 3 | 2021 |
Developing a mathematical model for planning repetitive construction projects by using support vector machine technique AM Burhan, KR Erzaij, WA Hatem Civil and Environmental Engineering 17 (2), 371-379, 2021 | 3 | 2021 |
Estimation and analysis of costs for electrical power transmission lines in Iraqi projects WA Hatem, KR Erzaij IOP Conference Series: Materials Science and Engineering 881 (1), 012044, 2020 | 3 | 2020 |
A neural network model for financial performance prediction: The case for road works in Bahrain SN Kadhim, KR Erzaij Test Engineering & Management 82, 1589-1599, 2020 | 3 | 2020 |
Determine an equation to calculate the annual maintenance cost for public hospitals (Al Sader City Hospital as a case study) KR Reziej, NH Al-Hilaly Journal of Engineering 23 (2), 1-12, 2017 | 3 | 2017 |
Building and analyzing a crisis management model using Fuzzy DEMATEL technique KRE Yasser Sahib Nassar Journal Of Algebraic Statistics 13 (2), 2664-2681, 2022 | 2 | 2022 |
Projects evaluation in construction industry KR Erzaij, HA Rashid, HI Naji, RH Ali Periodicals of Engineering and Natural Sciences 8 (3), 1808-1816, 2020 | 2 | 2020 |