Follow
Khaled Nassar
Title
Cited by
Cited by
Year
A procedure for multi-criteria selection of building assemblies
K Nassar, W Thabet, Y Beliveau
Automation in Construction 12 (5), 543-560, 2003
1112003
Developing a complexity measure for project schedules
KM Nassar, MY Hegab
Journal of construction engineering and management 132 (6), 554-561, 2006
1062006
Slum development using zero waste concepts: construction waste case study
SM Elgizawy, SM El-Haggar, K Nassar
Procedia Engineering 145, 1306-1313, 2016
992016
Genetic algorithms for ceiling form optimization in response to daylight levels
T Rakha, K Nassar
Renewable energy 36 (9), 2348-2356, 2011
732011
Using Weibull analysis for evaluation of cost and schedule performance
KM Nassar, HG Gunnarsson, MY Hegab
Journal of Construction Engineering and Management 131 (12), 1257-1262, 2005
732005
Evaluating cost overruns of asphalt paving project using statistical process control methods
KM Nassar, WM Nassar, MY Hegab
Journal of construction engineering and management 131 (11), 1173-1178, 2005
702005
Algorithms for automated deduction of topological information
TH Nguyen, AA Oloufa, K Nassar
Automation in construction 14 (1), 59-70, 2005
672005
Prequalification of Egyptian construction contractors using fuzzy‐AHP models
O Hosny, K Nassar, Y Esmail
Engineering, Construction and Architectural Management 20 (4), 381-405, 2013
582013
Layout optimization of construction site facilities with dynamic freeform geometric representations
I Abotaleb, K Nassar, O Hosny
Automation in Construction 66, 15-28, 2016
562016
Assessing building information modeling estimating techniques using data from the classroom
K Nassar
Journal of Professional Issues in Engineering Education and Practice 138 (3 …, 2012
562012
Evolutionary optimization of resource allocation in repetitive construction schedules
K Nassar
Journal of Information Technology in Construction (ITcon) 10 (18), 265-273, 2011
522011
Approaching sustainability of construction and demolition waste using zero waste concept
SM Elgizawy, SM El-Haggar, K Nassar
Low carbon economy 7 (1), 1-11, 2016
502016
Sign visibility for pedestrians assessed with agent-based simulation
K Nassar
Transportation research record 2264 (1), 18-26, 2011
502011
Simulation gaming in construction: ER, the equipment replacement game
K Nassar
Journal of Construction Education 7 (1), 16-30, 2002
472002
Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators
A Shiha, EM Dorra, K Nassar
Journal of Construction Engineering and Management 146 (3), 04020010, 2020
442020
Fuzzy clustering validity for contractor performance evaluation: Application to UAE contractors
K Nassar, O Hosny
Automation in Construction 31, 158-168, 2013
432013
Assessing the spatial and temporal variability of fine particulate matter components in Israeli, Jordanian, and Palestinian cities
JA Sarnat, T Moise, J Shpund, Y Liu, JE Pachon, R Qasrawi, Z Abdeen, ...
Atmospheric Environment 44 (20), 2383-2392, 2010
422010
Green envelop impact on reducing air temperature and enhancing outdoor thermal comfort in arid climates
S Wahba, B Kamil, K Nassar, A Abdelsalam
Civil Engineering Journal 5 (5), 1124-1135, 2019
402019
Solving the least-cost route cut and fill sequencing problem using particle swarm
K Nassar, O Hosny
Journal of construction engineering and management 138 (8), 931-942, 2012
392012
Building assembly detailing using constraint-based modeling
K Nassar, W Thabet, Y Beliveau
Automation in Construction 12 (4), 365-379, 2003
372003
The system can't perform the operation now. Try again later.
Articles 1–20