Singapore Bukit Timah granite: Slurry quality control for TBM tunneling M Marotta World Urban Transit Conference, 237-245, 2010 | 9 | 2010 |
Excavation Management System for Slurry TBM in Singapore JYT Chuan, M Marotta, CN Ow ITA–AITES world Tunnel Congress WTC 2018, 2017 | 5* | 2017 |
High pressure jet grouting for a collapsed tunnel—A case study A Davia, M Marotta, G Peach International Conference and Exhibition on Tunnelling and Trenchless …, 2006 | 4 | 2006 |
Grouting and its Application in Tunneling V Ganeshan, CN Ow, M Marotta, A Yoshimitsu, YY Jee Proceeding of the International conference on Deep Excavation, 2008 | 3 | 2008 |
High pressure jet grouting in tunnels–a case study A Da Vià, M Marotta, G Peach Proceedings of the International World Tunnel Congress and the 31st ITA …, 2005 | 3 | 2005 |
Theory and Application of Excavation Management System for Slurry TBM in Singapore TC Yee, M Marotta, CN Ow Underground Singapore 2018, 2018 | 2 | 2018 |
Latest development in Horizontal Grouting for Cross Passages in Thomson-East Coast Line C1-C2 J Lim, S Dinesh, OM Kumarasamy, M Marotta Hulme Prize, 2018 | 2 | 2018 |
Design and construction of twin mined tunnels in residual soil SY Tong, M Marotta, MC Joshi, CN Ow, V Singhal, R Stadelmann, ... Proceeding of the International conference on Deep Excavation, 2008 | 2 | 2008 |
Use of High Density Slurry for Shallow Tunneling in Thomson East Coast Line in H Bernard, MK Lau, M Senthilkumar, YS Sze, M Marotta, GT Senthilnath Proceeding of Underground Singapore 2018, 2018 | 1 | 2018 |
Singapore's Land Transport Authority: 15 years of innovative use of sprayed concrete lining M Marotta Proceeding of Singapore International Transport Congress and Exhibition …, 2013 | 1 | 2013 |
SCL challenge under AYA B Pearce, DKC Teck, M Marotta, M Tong Tunnels & Tunnelling International, 2008 | 1 | 2008 |
Design and construction of mined tunnels in challenging site conditions SY Tong, R Stadelmann, CR Mann, SK Tang, M Marotta, MC Joshi, ... Worls Tunnel Congress 2008-Underground Facilities for Better Environment and …, 2008 | 1 | 2008 |
Construction of 45m long cross passage in rock under the live CCL tunnel, in Thomson Line Contract 212 D Low, M Mohiadeen, M Marotta Underground Singapore 2023, 2023 | | 2023 |
Theoretical Basis and Practical Application of Excavation Management System for Tunnelling with EPB TBM V Sivalingam, L Pakianathan, M Marotta, V Diwakar Underground Singapore 2023, 2023 | | 2023 |
La resilienza nel mondo delle gallerie e la visione del sistema dei trasporti di Singapore M Marotta, GM Gaspari Gallerie e Grandi Opere Sotterranee, 51-53, 2022 | | 2022 |
High density slurry for shallow bored tunneling in Singapore H Bernard, MK Lau, M Senthilkumar, YS Sze, M Marotta, CN Ow, ... Tunnels and Underground Cities: Engineering and Innovation meet Archaeology …, 2019 | | 2019 |
T212 – Upper Thomson Station & Associated Tunnels (Undercrossing existing live CCL tunnels) M Marotta, SQ Lim, D Chen Underground Singapore 2018, 2018 | | 2018 |
Construction of a 170m Long Cripple Sided Tunnel Using Variable Geometry Hydraulic Formwork in DTL 3, C927 M Marotta, M Mohiadeen Underground Singapore 2018, 2018 | | 2018 |
Pre-supports for conventional tunnelling in soft ground: review and development of analytical method of analysis M Marotta Heriot-Watt University, 2013 | | 2013 |
Downtown Line 1, Contract 905 – Stacked Tunnelling under Formula 1 M Marotta, BM Pearce, CK Poh, CL Lee 37th World Tunnel Congress: Underground Spaces in the Service of a …, 2011 | | 2011 |