Follow
Mohammad Azim Eirgash
Title
Cited by
Cited by
Year
Time-cost trade-off optimization of construction projects using teaching learning based optimization
V Toğan, MA Eirgash
KSCE Journal of Civil Engineering 23, 10-20, 2019
662019
A multi-objective decision making model based on TLBO for the time-cost trade-off problems
MA Eirgash, V Toğan, T Dede
Structural Engineering and Mechanics 71 (2), 139-151, 2019
382019
Time-Cost Trade-Off Optimization with a New Initial Population Approach
V Toğan, MA Eirgash
Teknik Dergi 30 (6), 2018
132018
Earned value analysis for construction projects using project management scheduling engine
MA Eirgash
American Journal of Civil Engineering 7 (5), 121-125, 2019
92019
Resource Allocation and Leveling in Construction Management Projects with Resource Histogram
MA Eirgash
American Journal of Engineering and Technology Management 5 (6), 91-95, 2020
72020
A multi-objective improved teaching learning based optimization algorithm for time-cost trade-off problems
MA Eirgash, T Dede
Journal of Construction Engineering, Management & Innovation 1 (3), 118-128, 2018
72018
Time-Cost Trade off Optimization for Construction Projects Using an Optimization Engine
MA Eirgash, V Toğan, T Dede, HB Başağa
Eurasian Journal of Engineering Sciences and Technology, 54, 2017
72017
PARETO-FRONT PERFORMANCE OF MULTIOBJECTIVE TEACHING LEARNING BASED OPTIMIZATION ALGORITHM ON TIME-COST TRADE OFF OPTIMIZATION PROBLEMS
MA Eirgash
Karadeniz Technical University, 2018
62018
Application of Earned Value Based Metrics to Enhance the Performance Measurement of Engineering Project Management
MA Eirgash, V Toğan, A Kazaz
Digital Proceeding of ICOCEE–CAPPADOCIA, 2017
62017
A Novel Oppositional Teaching Learning Strategy Based on the Golden Ratio to Solve the Time-Cost-Environmental Impact Trade-Off Optimization Prob‐ lems
MA Eirgash, V Toğan
Expert Systems with Applications, https://doi.org/10.1016/j.eswa.2023.1199, 2023
52023
Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects
MA Eirgash, V Toğan, T Dede, HB Başağa
Structures 53, 806-821, 2023
42023
Time-Cost Trade-Off Optimization Using Siemens’s Effective Cost Slope Method
M Eirgash, V Toğan
12th International Congress on Advances in Civil Engineering, 2019
32019
An Integrated Multi-Criterion Decision-Making Analysis to Rank the Pareto-Front Solutions of Time-Cost Trade-Off Problems
MA Eirgash
International Journal of Management and Fuzzy Systems 7 (2), 28-40, 2021
22021
A Comparative Study of Seismic Performance of the Building Designed using Four Major Codes
MA Eirgash
no. August, 2019
22019
A Modified Oppositional Teaching-Learning-Based Optimization Model For Solving Construction Time-Cost-Quality Trade-Off Problems
MA Eirgash, V Toğan, MK Trivedi, K Sharma
7th International Project and Construction Management Conference (IPCMC2022 …, 2022
12022
Time–Cost Trade-Off Problems with Multi-objective Quasi-Oppositional Teaching Learning-Based Optimization
MA Eirgash, V Toğan, T Dede
Advanced Engineering Optimization Through Intelligent Techniques, 269-277, 2022
12022
Project Monitoring and Early Warning of Time-Cost Overruns in Earned Value Management
MA Eirgash, Y Baltaci
Curr. Trends Civ. Struct. Eng 7 (5), 1-7, 2021
12021
Utilizing the Golden region sampling to the oppositional Aquila optimizer in multiple objective trade-off optimization problems
MA Eirgash, V Toğan
The system can't perform the operation now. Try again later.
Articles 1–18