Follow
Project Production Institute
Project Production Institute
Project Production Institute
Verified email at projectproduction.org - Homepage
Title
Cited by
Cited by
Year
WorkPlan: Constraint-based database for work package scheduling
HJ Choo, ID Tommelein, G Ballard, TR Zabelle
Journal of Construction Engineering and Management 125 (3), 151-160, 1999
1881999
Learning to see work flow: an application of lean concepts to precast concrete fabrication
G Ballard, N Harper, T Zabelle
Engineering, Construction and Architectural Management 10 (1), 6-14, 2003
1832003
Production system design in construction
G Ballard, L Koskela, G Howell, T Zabelle
Annual Conference of the International Group for Lean Construction 9, 1-15, 2001
1712001
Production system design: Work structuring revisited
G Ballard, L Koskela, G Howell, T Zabelle
White Paper 11, 2001
692001
Lean design: Process, tools, & techniques
G Ballard, T Zabelle
White Paper 10, 1-15, 2000
692000
Implementing Lean in construction: How to succeed
R Arbulu, T Zabelle
14th Annual Conference of the International Group for Lean Construction, 553-565, 2006
682006
Proactive approach for reducing non-value adding activities due to time-space conflicts
B Akinci, M Fischer, T Zabelle
Sixth Annual Conf. of the Int. Group for Lean Construction (IGLC-6), 1-16, 1998
591998
Project definition
G Ballard, T Zabelle
White paper 9, 2000
552000
Workplan database for work package production scheduling
HJ Choo, ID Tommelein, G Ballard, TR Zabelle
Proc. Sixth Annl. Conf. of the Intl. Group for Lean Construction, 13-15, 1998
241998
New Era of Project Delivery-Project As Production System
RG Shenoy, TR Zabelle
Journal of Project Production Management 1 (1), 13-24, 2016
172016
Delivering value through the use of three dimensional computer modeling
TR Zabelle, MA Fischer
CIB REPORT, 197-204, 1999
141999
The LAST DESIGNER’S database-CAD for sourcing, procurement, and planning
M Sadonio, ID Tommelein, TR Zabelle
Proc. ASCE Comp. Congress ‘98, 1998
141998
A Comparison of Lean Construction with Project Production Management
R Shenoy, T Zabelle
Project Production Institute Journal 2, 2017
102017
Rethinking the product-process matrix for projects
ML Spearman, JHJ Choo
Rethinking the Product-Process Matrix for Projects, 2018
52018
Contrasting project production control with project controls
RJ Arbulu, HJ Choo, M Williams
Journal of project production management 1, 2016
52016
The Last Planner Production System Workbook
G Ballard, G Howell, I Tommelein, T Zabelle
Lean Constr. Institute, San Fr. California, USA, 81pp, 82, 2007
52007
Project definition white paper 9
G Ballard, T Zabelle
LCI, Lean Construction Institute, On line at: http://p2sl. berkeley. edu …, 2000
52000
Constraint-Based Database for Work Package Scheduling
HJ Choo, ID Tommelein, G Ballard, TR Zabelle
Computing in Civil Engineering, 169-180, 1998
41998
Little’s Law: A practical approach to understanding production system performance
HJJ Choo
Project Production Institute Journal 1, 2016
32016
A method to optimize onshore drilling rig fleet size and schedule considering both reservoir management and operational objectives
F Flager
Journal of Project Production Management 1 (2014), 2014
32014
The system can't perform the operation now. Try again later.
Articles 1–20