Delay and cost overrun in infrastructure projects in Jordan
N Al-Hazim, ZA Salem, H Ahmad
Procedia Engineering 182, 18-24, 2017
2442017
Delay and cost overrun in road construction projects in Jordan
N Al-Hazim, ZA Salem
International Journal of Engineering & Technology 4 (2), 288, 2015
822015
Effect of waste glass on properties of asphalt concrete mixtures
ZTA Salem, TS Khedawi, MB Baker, R Abendeh
Jordan Journal of Civil Engineering 11 (1), 2017
592017
Production of sustainable asphalt mixes using recycled polystyrene
MB Baker, R Abendeh, Z Abu-Salem, T Khedaywi
International Journal of Applied Environmental Sciences 11 (1), 183-192, 2016
322016
An exercise on slope stability and perfect elastoplasticity
C Di Prisco, F Pisanò
Géotechnique 61 (11), 923-934, 2011
302011
Identification of delay factor in Oman construction industry
AMD Al Saadi, IA Rahman
International Journal of Sustainable Construction Engineering and Technology …, 2019
192019
A new technique for deep in situ measurements of soil water retention behaviour
I Rocchi, CG Gragnano, L Govoni, A Mentani, M Bittelli, P Castiglione, ...
Geotechnical Research 5 (1), 3-12, 2018
172018
Minimizing delays in the Jordanian construction industry by adopting BIM technology
M Btoush, AT Harun
IOP Conference Series: Materials Science and Engineering 271 (1), 012041, 2017
172017
Solar energy sustainability in Jordan
A Qasaimeh, M Qasaimeh, Z Abu-Salem, M Momani
Computational Water, Energy, and Environmental Engineering 2014, 2014
172014
Concrete containing recycled waste glass: strength and resistance to freeze–thaw action
RM Abendeh, ZT AbuSalem, MI Bani Baker, TS Khedaywi
Proceedings of the Institution of Civil Engineers-Construction Materials 174 …, 2021
102021
Risk factors causing time delay in the Jordanian construction sector
ZTA Salem, A Suleiman
International Journal of Engineering Research and Technology 13 (2), 307-315, 2020
102020
Time delay and cost overrun in construction projects
P Asmitha
IRE Journal 3 (5), 44-51, 2019
92019
The feasibility of using milled glass wastes in concrete to resist freezing-thawing action
R Abendeh, MB Baker, ZA Salem, H Ahmad
pan 2, 100, 2015
82015
Implementation challenges and handling project management complexities in China-Pakistan Economic Corridor
T Sarmad, MA Choudhary
2019 Portland International Conference on Management of Engineering and …, 2019
72019
Determinations of critical gap and follow-up time at roundabouts in Jordan
N Hazim, SM Bazlamit, ZA Salem, O Alghazawi, I Odeh
Roads and Bridges-Drogi i Mosty 18 (3), 227-234, 2019
62019
Impact of Roadside Fixed Objects in Traffic Conditions.
N Hazim, L Shbeeb, ZA Salem
Engineering, Technology & Applied Science Research 10 (2), 2020
52020
Optimization of shape design for gravity retaining walls
T Masoud, H Alsharie, ZA Salem, YIO Yahia, MO Suliman
Int J Innov Sci Mod Eng 5, 2018
42018
Time and Cost Overruns in Jordanian Building Construction Projects
S Tarawneh, MK Sarireh, E Tarawneh
Natural and Applied Sciences Series 35 (1), 2020
32020
Analysis of Air Pollutants’ Concentration in Terms of Traffic Conditions and Road Gradient in an Urban Area
Z Abusalem, I Odeh, N Al-Hazim, SM Bazlamit, A Al-Saket
Jordan Journal of Civil Engineering 13 (3), 2019
32019
Recycling of Steel Bars from Demolished Structures
KAD Bsisu, ZA Salem
International Journal of Engineering Research and Technology 13 (1), 94-99, 2020
22020
يتعذر على النظام إجراء العملية في الوقت الحالي. عاود المحاولة لاحقًا.
مقالات 1–20