Achieving a seismic risk target for a seismically isolated advanced reactor CC Yu, BM Carmichael, JP Redd, BM Chisholm, MW Peres, BI Song, ... Transactions of the American Nuclear Society 127 (1), 764-767, 2022 | 2 | 2022 |
Earthquake simulator experiments of a seismically isolated generation IV reactor model FUH Mir, KM Lal, BD Kosbab, K Tilow, B Song, N Nguyen, M Clavelli, ... Proceedings, 12th United States National Conference on Earthquake …, 2022 | 2 | 2022 |
A comparison of challenges associated with sludge removal, treatment and disposal at several spent fuel storage locations MW Peres Hanford Site, 2007 | 1 | 2007 |
Making Ethics Real in Nuclear Engineering-Panel D Hoffman, E Quinn, MB Raap, S Bowman, M Peres, N Tsoulfanidis, ... Nuclear Science and Engineering, 2022 | | 2022 |
LESSONS LEARNED IN OPERATING THE HOSE-IN-HOSE SYSTEM FOR TRANSFSERRING SLUDGE AT HANFORDS K-BASINS P MW Hanford Site (HNF), Richland, WA (United States), 2008 | | 2008 |
LESSONS LEARNED IN OPERATING THE HOSE-IN-HOSE SYSTEM FOR TRANSFSERRING SLUDGE AT HANFORD'S K BASINS MW PERES Hanford Site, 2008 | | 2008 |
200 Area effluent treatment facility process control plan 95-001 NJ Sullivan, DL Flyckt, MW Peres Westinghouse Hanford Co., 1995 | | 1995 |
Documentation assessment, Project C-018H, 200-E area effluent treatment facility MW Peres, MD Connor, JI Mertelendy Westinghouse Hanford Co., 1994 | | 1994 |
RISK-INFORMED DESIGN OF A SEISMIC ISOLATION SYSTEM FOR ADVANCED NUCLEAR POWER PLANTS CC Yu, BM Carmichael, JP Redd, BM Chisholm, MW Peres, BI Song, ... | | |
Fluor Government Group PO Box 1050, Richland, WA 99352 USA MW Peres | | |