دنبال کردن
Rifat Sönmez
Rifat Sönmez
ایمیل تأیید شده در metu.edu.tr
عنوان
نقل شده توسط
نقل شده توسط
سال
Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects
S Aminbakhsh, M Gunduz, R Sonmez
Journal of safety research 46, 99-105, 2013
5082013
Construction labor productivity modeling with neural networks
R Sonmez, JE Rowings
Journal of construction engineering and management 124 (6), 498-504, 1998
2541998
Conceptual cost estimation of building projects with regression analysis and neural networks
R Sonmez
Canadian Journal of Civil Engineering 31 (4), 677-683, 2004
2002004
A smart contract system for security of payment of construction contracts
S Ahmadisheykhsarmast, R Sonmez
Automation in construction 120, 103401, 2020
1922020
A hybrid genetic algorithm for the discrete time–cost trade-off problem
R Sonmez, ÖH Bettemir
Expert Systems with Applications 39 (13), 11428-11434, 2012
1602012
Parametric range estimating of building costs using regression models and bootstrap
R Sonmez
Journal of construction Engineering and Management 134 (12), 1011-1016, 2008
1142008
Discrete particle swarm optimization method for the large-scale discrete time–cost trade-off problem
S Aminbakhsh, R Sonmez
Expert Systems with Applications 51, 177-185, 2016
1092016
Quantiative methodology for determination of cost contingency in international projects
R Sonmez, A Ergin, MT Birgonul
Journal of Management in Engineering 23 (1), 35-39, 2007
1042007
Range estimation of construction costs using neural networks with bootstrap prediction intervals
R Sonmez
Expert systems with applications 38 (8), 9913-9917, 2011
842011
Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling
ÖH Bettemir, R Sonmez
Journal of Management in Engineering 31 (5), 04014082, 2015
792015
Predesign cost estimation of urban railway projects with parametric modeling
R Sonmez, B Ontepeli
Journal of Civil Engineering and management 15 (4), 405-409, 2009
652009
Backward-forward hybrid genetic algorithm for resource-constrained multiproject scheduling problem
R Sonmez, F Uysal
Journal of Computing in Civil Engineering 29 (5), 04014072, 2015
492015
Pareto front particle swarm optimizer for discrete time-cost trade-off problem
S Aminbakhsh, R Sonmez
Journal of Computing in Civil Engineering 31 (1), 04016040, 2017
482017
BIM integrated smart contract for construction project progress payment administration
R Sonmez, S Ahmadisheykhsarmast, AA Güngör
Automation in Construction 139, 104294, 2022
452022
A support vector machine method for bid/no bid decision making
R Sonmez, B Sözgen
Journal of Civil Engineering and Management 23 (5), 641-649, 2017
402017
Blockchain in project management: a systematic review of use cases and a design decision framework
R Sonmez, FÖ Sönmez, S Ahmadisheykhsarmast
Journal of Ambient Intelligence and Humanized Computing, 1-15, 2023
232023
Hybrid optimization method for large-scale multimode resource-constrained project scheduling problem
R Sonmez, M Gürel
Journal of Management in Engineering 32 (6), 04016020, 2016
222016
Review of conceptual cost modeling techniques
R Sonmez
AACE International Transactions, ES71, 2005
212005
Impact of occasional overtime on construction labor productivity: quantitative analysis
R Sonmez
Canadian Journal of Civil Engineering 34 (7), 803-808, 2007
202007
Activity uncrashing heuristic with noncritical activity rescheduling method for the discrete time-cost trade-off problem
R Sonmez, S Aminbakhsh, T Atan
Journal of Construction Engineering and Management 146 (8), 04020084, 2020
172020
سیستم در حال حاضر قادر به انجام عملکرد نیست. بعداً دوباره امتحان کنید.
مقاله‌ها 1–20