Using intuitionistic fuzzy sets for fault-tree analysis on printed circuit board assembly MH Shu, CH Cheng, JR Chang Microelectronics Reliability 46 (12), 2139-2148, 2006 | 500 | 2006 |
Application and comparison of several machine learning algorithms and their integration models in regression problems JC Huang, KM Ko, MH Shu, BM Hsu Neural Computing and Applications 32 (10), 5461-5469, 2020 | 106 | 2020 |
Fault-tree analysis for liquefied natural gas terminal emergency shutdown system SR Cheng, B Lin, BM Hsu, MH Shu Expert Systems with Applications 36 (9), 11918-11924, 2009 | 93 | 2009 |
Fuzzy inference to assess manufacturing process capability with imprecise data BM Hsu, MH Shu European Journal of Operational Research 186 (2), 652-670, 2008 | 93 | 2008 |
Fuzzy X and R control charts: Fuzzy dominance approach MH Shu, HC Wu Computers & Industrial Engineering 61 (3), 676-685, 2011 | 87 | 2011 |
Quality-based supplier selection and evaluation using fuzzy data MH Shu, HC Wu Computers & Industrial Engineering 57 (3), 1072-1079, 2009 | 77 | 2009 |
Lower confidence bounds with sample size information for Cpm applied to production yield assurance WL Pearn, MH Shu International Journal of Production Research 41 (15), 3581-3599, 2003 | 76 | 2003 |
Supplier selection using fuzzy quality data and their applications to touch screen BM Hsu, CY Chiang, MH Shu Expert Systems with Applications 37 (9), 6192-6200, 2010 | 69 | 2010 |
Reliability assessment and replacement for machine tools under wear deterioration BM Hsu, MH Shu The International Journal of Advanced Manufacturing Technology 48, 355-365, 2010 | 50 | 2010 |
Extended FMEA for sustainable manufacturing: An empirical study in the non-woven fabrics industry TL Nguyen, MH Shu, BM Hsu Sustainability 8 (9), 939, 2016 | 49 | 2016 |
An energy-efficient smart city for sustainable green tourism industry CW Lu, JC Huang, C Chen, MH Shu, CW Hsu, BRT Bapu Sustainable Energy Technologies and Assessments 47, 101494, 2021 | 47 | 2021 |
Variable-sampling plans based on lifetime-performance index under exponential distribution with censoring and its extensions CW Wu, MH Shu, YN Chang Applied Mathematical Modelling 55, 81-93, 2018 | 47 | 2018 |
A flexible process-capability-qualified resubmission-allowed acceptance sampling scheme CW Wu, MH Shu, AA Nugroho, N Kurniati Computers & Industrial Engineering 80, 62-71, 2015 | 44 | 2015 |
Manufacturing capability control for multiple power-distribution switch processes based on modified Cpk MPPAC WL Pearn, MH Shu Microelectronics Reliability 43 (6), 963-975, 2003 | 43 | 2003 |
Dynamic performance measures for tools with multi-state wear processes and their applications for tool design and selection MH Shu, BM Hsu, KC Kapur International journal of production research 48 (16), 4725-4744, 2010 | 41 | 2010 |
Testing process capability based on Cpm in the presence of random measurement errors WL Pearn, MH Shu, BM Hsu Journal of Applied Statistics 32 (10), 1003-1024, 2005 | 40 | 2005 |
Measuring process capability based on Cpmk with gauge measurement errors BM Hsu, MH Shu, WL Pearn Quality and Reliability Engineering International 23 (5), 597-614, 2007 | 38 | 2007 |
Bootstrap approach for supplier selection based on production yield CW Wu, MH Shu, WL Pearn, KH Liu International Journal of Production Research 46 (18), 5211-5230, 2008 | 34 | 2008 |
Fuzzy testing and selecting better processes performance SR Cheng, BM Hsu, MH Shu Industrial Management & Data Systems 107 (6), 862-881, 2007 | 32 | 2007 |
Monitoring imprecise fraction of nonconforming items using p control charts MH Shu, HC Wu Journal of Applied Statistics 37 (8), 1283-1297, 2010 | 30 | 2010 |