Follow
Qiang Xu
Qiang Xu
Chemical Engineering, Lamar University
Verified email at lamar.edu - Homepage
Title
Cited by
Cited by
Year
Optimal design and operation of a C3MR refrigeration system for natural gas liquefaction
M Wang, J Zhang, Q Xu
Computers & Chemical Engineering 39, 84-95, 2012
1232012
Chemical plant flare minimization via plantwide dynamic simulation
Q Xu, X Yang, C Liu, K Li, HH Lou, JL Gossage
Industrial & Engineering Chemistry Research 48 (7), 3505-3512, 2009
922009
Thermodynamic-analysis-based energy consumption minimization for natural gas liquefaction
M Wang, J Zhang, Q Xu, K Li
Industrial & engineering chemistry research 50 (22), 12630-12640, 2011
862011
Simulation study on boil-off gas minimization and recovery strategies at LNG exporting terminals
YM Kurle, S Wang, Q Xu
Applied Energy 156, 628-641, 2015
672015
Dynamic simulation of LNG loading, BOG generation, and BOG recovery at LNG exporting terminals
YM Kurle, S Wang, Q Xu
Computers & chemical engineering 97, 47-58, 2017
582017
Thermodynamic-analysis-based design and operation for boil-off gas flare minimization at LNG receiving terminals
C Liu, J Zhang, Q Xu, JL Gossage
Industrial & Engineering Chemistry Research 49 (16), 7412-7420, 2010
582010
Cyclic scheduling for best profitability of industrial cracking furnace system
C Liu, J Zhang, Q Xu, K Li
Computers & chemical engineering 34 (4), 544-554, 2010
502010
Cascade refrigeration system synthesis based on exergy analysis
J Zhang, Q Xu
Computers & chemical engineering 35 (9), 1901-1914, 2011
492011
Cyclic scheduling for ethylene cracking furnace system with consideration of secondary ethane cracking
C Zhao, C Liu, Q Xu
Industrial & engineering chemistry research 49 (12), 5765-5774, 2010
442010
Real‐time dynamic hoist scheduling for multistage material handling process under uncertainties
C Zhao, J Fu, Q Xu
AIChE Journal 59 (2), 465-482, 2013
392013
Dynamic scheduling for ethylene cracking furnace system
C Zhao, C Liu, Q Xu
Industrial & engineering chemistry research 50 (21), 12026-12040, 2011
382011
Process and carbon footprint analyses of the Allam cycle power plant integrated with an air separation unit
D Fernandes, S Wang, Q Xu, R Buss, D Chen
Clean technologies 1 (1), 22, 2019
352019
Optimal design and operation for simultaneous shale gas NGL recovery and LNG re-gasification under uncertainties
M Wang, Q Xu
Chemical Engineering Science 112, 130-142, 2014
352014
Integration of electroplating process design and operation for simultaneous productivity maximization, energy saving, and freshwater minimization
C Liu, C Zhao, Q Xu
Chemical engineering science 68 (1), 202-214, 2012
352012
Emission source characterization for proactive flare minimization during ethylene plant start-ups
C Liu, Q Xu
Industrial & engineering chemistry research 49 (12), 5734-5741, 2010
352010
ACS–based dynamic optimization for curing of polymeric coating
J Xiao, J Li, Q Xu, Y Huang, HH Lou
AIChE journal 52 (4), 1410-1422, 2006
352006
A hybrid programming model for optimal production planning under demand uncertainty in refinery
LI Chufu, HE Xiaorong, C Bingzhen, XU Qiang, LIU Chaowei
Chinese journal of chemical engineering 16 (2), 241-246, 2008
302008
石脑油在 SRT-IV 型工业炉清洁辐射管中裂解的数学模拟
徐强, 陈丙珍, 何小荣, 张蕾
计算机与应用化学 18 (3), 223-228, 2001
302001
Simultaneous scheduling of front-end crude transfer and refinery processing
J Xu, S Zhang, J Zhang, S Wang, Q Xu
Computers & Chemical Engineering 96, 212-236, 2017
292017
A novel conceptual design by integrating NGL recovery and LNG regasification processes for maximum energy savings
M Wang, J Zhang, Q Xu
AIChE Journal 59 (12), 4673-4685, 2013
292013
The system can't perform the operation now. Try again later.
Articles 1–20