Follow
Marton Marosszeky
Marton Marosszeky
UWS
Verified email at marosszekyassociates.com - Homepage
Title
Cited by
Cited by
Year
Governmentality matters: designing an alliance culture of inter-organizational collaboration for managing projects
SR Clegg, TS Pitsis, T Rura-Polley, M Marosszeky
Organization studies 23 (3), 317-337, 2002
5412002
Constructing the Olympic dream: A future perfect strategy of project management
TS Pitsis, SR Clegg, M Marosszeky, T Rura-Polley
Organization science 14 (5), 574-590, 2003
3742003
Using limestone aggregates and different cements for enhancing resistance of concrete to sulphuric acid attack
ZT Chang, XJ Song, R Munn, M Marosszeky
Cement and concrete research 35 (8), 1486-1494, 2005
2602005
Managing subcontractor supply chain for quality in construction
K Karim, M Marosszeky, S Davis
Engineering, Construction and Architectural Management 13 (1), 27-42, 2006
1732006
Durability of fly ash based geopolymer concrete against sulphuric acid attack
XJ Song, M Marosszeky, M Brungs, R Munn
International Conference on Durability of Building Materials and Components 10, 2005
1732005
An empirical investigation into the link between information technology implementation barriers and coping strategies in the Australian construction industry
RA Stewart, S Mohamed, M Marosszeky
Construction Innovation 4 (3), 155-171, 2004
1702004
Evaluating outcomes from ISO 9000-certified quality systems of Hong Kong constructors
SM Dissanayaka, MM Kumaraswamy, K Karim, M Marosszeky
Total Quality Management 12 (1), 29-40, 2001
1392001
The importance of project culture in achieving quality outcomes in construction
R Thomas, M Marosszeky, K Karim, S Davis, D McGeorge
Proceedings Iglc 10, 1-13, 2002
1322002
Total quality in the construction supply chain
JS Oakland, M Marosszeky
Routledge, 2006
1272006
Polarisation behaviour of steel bar samples in concrete in seawater. Part 1: Experimental measurement of polarisation curves of steel in concrete
ZT Chang, B Cherry, M Marosszeky
Corrosion Science 50 (2), 357-364, 2008
822008
Process monitoring for process re-engineering-using key performance indicators
K Karim, M Marosszeky
International conference on construction process reengineering, CPR 99, 1999
621999
Quality management tools for lean production-moving from enforcement to empowerment
M Marosszeky, R Thomas, K Karim, S Davis, D McGeorge
Proc., IGLC-10, 10th Conf. of Int. Group for Lean Construction, 87-99, 2002
612002
Organizational effectiveness model for quality management systems in the Australian construction industry
K Karim, M Marosszeky, M Kumaraswamy
Total quality management & business excellence 16 (6), 793-806, 2005
522005
Making the future perfect: constructing the Olympic dream
SR Clegg, TS Pitsis, M Marosszeky, T Rura-Polley
Making projects critical, 265-293, 2006
502006
Polarisation behaviour of steel bar samples in concrete in seawater. Part 2: A polarisation model for corrosion evaluation of steel in concrete
ZT Chang, B Cherry, M Marosszeky
Corrosion science 50 (11), 3078-3086, 2008
422008
Response of geopolymer concrete to sulphuric acid attack
XJ Song, M Marosszeky, M Brungs, ZT Chang
Proceedings of World Congress Geopolymer, 157-160, 2005
392005
Restrained shrinkage in repaired reinforced concrete elements
YS Yuan, M Marosszeky
Materials and structures 27, 375-382, 1994
361994
Towards total project quality–a review of research needs
AR Toakley, M Marosszeky
Engineering, Construction and Architectural Management 10 (3), 219-228, 2003
352003
Does quality assurance deliver higher productivity?
DA Langford, H El-Tigani, M Marosszeky
Construction Management and Economics 18 (7), 775-782, 2000
342000
Constructing the Olympic dream: Managing innovation through the future perfect
T Pitsis, SR Clegg, M Marosszeky, T Rura-Polley
Organization Science 14 (5), 574-590, 2003
322003
The system can't perform the operation now. Try again later.
Articles 1–20