LIFE-CYCLE COST FOR DESIGN OF ARMY DRAINAGE STRUCTURES (WITH DISCUSSION AND CLOSURE)
JC Potter, L Schneider - Transportation Research Record, 1988 - trid.trb.org
Many factors are involved in the design of drainage systems. Although not necessarily
overriding, the cost is often one of the most important factors. This cost should be the total,
overall cost of the alternative over its projected life, or life-cycle cost. Unless the life-cycle
cost is considered over first cost, the owner cannot be assured of receiving maximum value
for his construction and maintenance dollars. The importance of the other decision factors
are established for Army projects by the minimum functional requirements of the project …
overriding, the cost is often one of the most important factors. This cost should be the total,
overall cost of the alternative over its projected life, or life-cycle cost. Unless the life-cycle
cost is considered over first cost, the owner cannot be assured of receiving maximum value
for his construction and maintenance dollars. The importance of the other decision factors
are established for Army projects by the minimum functional requirements of the project …
[PDF][PDF] Life-Cycle Cost for Design of Army Drainage Structures
JC Potter, L Schindler - 1988 - onlinepubs.trb.org
Many factors are involved in the design of drainage systems. Although not necessarily
overriding, the cost is often one of the most important factors. This cost should be the total,
overall cost of the alternative over its projected life, or life-cycle cost. Unless the life-cycle
cost is considered over first cost, the owner cannot be assured of receiving maximum value
for his construction and maintenance dollars. The importance of the other decision factors
are established for Army projects by the minimum functional requirements of the project …
overriding, the cost is often one of the most important factors. This cost should be the total,
overall cost of the alternative over its projected life, or life-cycle cost. Unless the life-cycle
cost is considered over first cost, the owner cannot be assured of receiving maximum value
for his construction and maintenance dollars. The importance of the other decision factors
are established for Army projects by the minimum functional requirements of the project …