Scheduling of waterway projects with complex interrelations
SL Wang, P Schonfeld - Transportation Research Record, 2008 - journals.sagepub.com
SL Wang, P Schonfeld
Transportation Research Record, 2008•journals.sagepub.comA model is developed for selecting and scheduling interrelated waterway projects. It
considers multiple alternatives, which may be implemented at different times, for each lock
site, subject to budget constraints. This large combinatorial problem is analyzed with a
simulation-based optimization model, in which simulation is used to evaluate alternative
project schedules. A genetic algorithm is developed to solve the problem efficiently, subject
to constraints on project multiplicity and precedence.
considers multiple alternatives, which may be implemented at different times, for each lock
site, subject to budget constraints. This large combinatorial problem is analyzed with a
simulation-based optimization model, in which simulation is used to evaluate alternative
project schedules. A genetic algorithm is developed to solve the problem efficiently, subject
to constraints on project multiplicity and precedence.
A model is developed for selecting and scheduling interrelated waterway projects. It considers multiple alternatives, which may be implemented at different times, for each lock site, subject to budget constraints. This large combinatorial problem is analyzed with a simulation-based optimization model, in which simulation is used to evaluate alternative project schedules. A genetic algorithm is developed to solve the problem efficiently, subject to constraints on project multiplicity and precedence.